Entry name:Beibaixiang Yinyu Village Biochemical Waste Landfill Site
Project location:Yinyu Village, Beibaixiang Town, Yueqing City, Wenzhou City, Zhejiang Province
Operation mode:Equipment purchase contract and operation
Technology:Two-stage dish reverse osmosis (DTRO) pressure filtrate pretreatment
The landfill has been closed. The amount of leachate produced and treated by the pile body has remained at an average of 100 cubic meters per day. The amount of press filtrate entering the site is temporarily uncertain. The produced water is 70 cubic meters, the system recovery rate is 70%, and the produced water meets the discharge standard in Table 2 of the "Landfill Pollution Control Standard for Domestic Waste" (GB16889-s2008). After reaching the standard, the produced water is discharged into the nearby water body.
1. Prepared technical solutions;
2. Design process drawings;
3. On-site technical guidance;
4. Research and development of process materials.
1. Prepared electrical design scheme;
2. Wrote application control programs;
3. Design electrical automatic control drawings;
4. Electrical construction wiring debugging.
1. Prepared technical solutions;
2. Design process drawings;
3. On-site technical guidance;
4. Research and development of process materials.
1. Prepared mechanical design scheme;
2. Design 3D manufacturing drawings;
3. Machining drawing, mechanical design;
4. 3D design of site construction.
1. Prepare electrical design scheme
2. Write application control program;
3. Design electrical control drawings;
4. Electrical construction wiring debugging